A view of the rear of the barn prior to installation of the new floor, showing replaced subfloor and repairs to the left hand side studs and support post.
View showing the vapor barrier part-way through installation and repairs to the studs and support post in this corner. This shot also shows the header installed over the window which needed completing prior to installing the remainder ledger for the loft level.