The three layers of the dining room floor have been removed in this picture. The large stones in the upper left are the top-level course in the stone wall that forms the cold cellar.
New electrical service and relocating of load center completed. The original drop to the house was degraded, and plans for electric car charging and a heat-pump based HVAC system determined the need for an upgrade