Well connection complete and cap installed. Some of the granite tailings were retained for capping the original well later.
The original ceiling did not allow for insulation - the interior slope of the roof was truncated the provide the maximum area of flat ceiling. Lumber was added to provide this space and also space for the ventilation from the bathroom. This will result in a sloped section of the ceiling against the outside wall.
Roof ventilation system installed prior to insulation.